2027 Wall Poster Calendar - Project Planner

2027 Wall Poster Calendar - Project Planner

16″×24″
$25.00
Skip to product information
2027 Wall Poster Calendar - Project Planner

2027 Wall Poster Calendar - Project Planner

$25.00
Shipping calculated at checkout.
Size

Plan your whole year without flipping pages.

This minimalist 2027 Year Planner displays all twelve months on a single large wall calendar, making it easy to visualize deadlines, vacations, birthdays, projects, appointments, and important events throughout the year.

Designed with clean lines and plenty of writing space, it's perfect for homes, offices, classrooms, studios, and family command centers. Whether you're planning work projects, school schedules, content calendars, or personal goals, this yearly planner helps you keep everything in one place.

Available in two large sizes so you can choose the perfect fit for your workspace.

Details & Specs
  • Material: Printed on thick, museum-quality matte paper (10.3 mil / 0.26 mm) that’s smooth to the touch and rich in detail.
  • Dimensions: 24″ × 16″ or 36″ × 24″
  • Details: Each print is made on demand (no waste, no minimums, just good vibes).
Shipping & Returns
  • How This Item Arrives: Custom Made Just for You — This product is made just for you once you place your order. It may ship separately from other items — thanks for your patience while we create something special.
  • Processing Time: This item ships within 5–7 days.
  • Returns & Exchanges:
    No take-backs on this one, friend. More info in our Return Policy.
Safety & Product Info

GPSR Manufacturer:

  • In compliance with the General Product Safety Regulation (GPSR), Good Things and SINDEN VENTURES LIMITED ensure that all consumer products offered are safe and meet EU standards. For any product safety related inquiries or concerns, please contact our EU representative at gpsr [!at] sindenventures.com. You can also write to us at PO BOX 8224 Lacey WA 98509 or Markou Evgenikou 11, Mesa Geitonia, 4002, Limassol, Cyprus.
  • Product Safety: This product is intended for indoor use only. Keep away from fire and heat sources. Not intended as a toy. Paper edges may be sharp; handle with care.

Designed with Love

Shop Small, Feel Good

Do Good with Your Order

Also pairs well with these goodies